- Activities Covered:
 - 
		
Authorizes the placement of aquatic farm structures in navigable waters within the State of Alaska.
 - Purpose:
 - 
		
To prevent unauthorized obstruction or alteration of any navigable water of the United States.
 - Process:
 - 
		
Dependent on what type of authorization is required for the project. There are two permit types are used for aquatic farm projects:
Letter of Permission (LOP) — Letters of permission are a type of permit issued through an abbreviated processing procedure. It includes coordination with federal and state fish and wildlife agencies as required by the Fish and Wildlife Coordination Act, and a public interest evaluation but without the publishing of an individual public notice. The letter is an expedited process for an individual permit, where a decision to issue is made within 45 days.
Individual Permit — Individual permits are issued following a full public interest review of an individual application for an Army permit. A public notice, usually lasting 30 days, is distributed to all known interested persons. The permit decision is generally based on the outcome of a public interest balancing process, where the benefits of the project are weighed against the detriments.
More details on each permit can be found here.
For monitoring - Site inspections may be conducted.
 - Fees:
 - 
		
None
 
More Information: U.S. Army Corps of Engineers Alaska District
	United States Army Corps of Engineers (USACE)
	Alaska District
Southeast Regional Contact:
	Juneau Regulatory Field Office
	U.S. Army Corps of Engineers
	8800 Glacier Highway
	Suite 106
	Juneau, AK 99801-8079
	Phone (907) 790-4490
Southcentral Regional Contact:
	U.S. Army Corps of Engineers
	Kenai Field Office
	Benco Building
	805 Frontage Road, Suite 200C
	Kenai, Alaska 99611-7755
	Phone (907) 283-3519
	Fax (907) 283-3981